swayd.
EN DE
Metro Line 13 To Cut Road Travel Time By 50 Per Cent, Connect Mira-Bhayandar With Vasai-Virar
Free Press Journal

Metro Line 13 To Cut Road Travel Time By 50 Per Cent, Connect Mira-Bhayandar With Vasai-Virar

Metro Line 13, approved at Rs 17,724.99 crore, will connect Mira-Bhayandar with Vasai-Virar through a 25.03-km corridor and 4.92-km integrat

Zum Angebot
In swayd öffnen